Journal

The Journal.

Plain-language guides to custom home building and renovation, plus multiplex development, zoning, and what BC's new housing rules mean for Metro Vancouver and the Fraser Valley homeowners and investors.

Custom Homes

How a pre-construction budget protects you from change orders

Most change orders are decisions that were never made or never priced. A proper budget before construction closes those gaps while changes are still cheap.

Mark Van Ek · November 19, 2026 · 6 min read

Custom Homes

Coach house and garden suite rules in the Township of Langley (2026)

Zoning Bylaw 2500 section by section: which Township of Langley zones allow a coach house or garden suite, how big and tall it can be, where it sits, parking, Willoughby's garage zones and the City of Langley's rules.

Mark Van Ek · November 18, 2026 · 12 min

Custom Homes

Pre-construction services in BC: hire us for planning and budgeting only

You can hire a builder to plan and price your project without signing up to build with them. Here is what pre-construction covers, who it suits, and how it works with your architect.

Mark Van Ek · November 17, 2026 · 6 min

Renovations

Do you need a permit to renovate a bathroom in Langley?

Which bathroom jobs need a permit in the Township of Langley and the City of Langley, which need one from Technical Safety BC, what the Township fees come to, and what the Township's building bylaw says about work done without a permit.

Mark Van Ek · November 16, 2026 · 8 min

Custom Homes

Septic and well for a new house in Langley: permits, setbacks and tests

How a septic system and a well are designed, filed, spaced and tested for a new house on a rural Langley lot, with the design flow worked out from the provincial manual and the distances that fix the site plan.

Mark Van Ek · November 15, 2026 · 10 min

Custom Homes

Building a house on ALR farmland in Langley: what the rules allow

How big a house can be on ALR land in the Township of Langley, when a second home for family needs no application, what counts toward about 5,380 sq ft and about 970 sq ft, and how a NARU application moves through the Township and the ALC.

Mark Van Ek · November 14, 2026 · 11 min

Custom Homes

How to get a building permit for a new house in the Township of Langley

Every step of a new house permit in the Township of Langley, from the 30-day title search to written approval to move in, with the Bylaw 4616 fee worked out line by line.

Mark Van Ek · November 13, 2026 · 11 min

Contracts & Costs

Your home insurance probably stops when the renovation starts

Homeowners assume their existing policy carries through the project. Most policies were written for a house somebody lives in, and a construction site is a different risk. Ask before the work starts, not after something happens.

Mark Van Ek · October 26, 2026 · 8 min

Renovations

The hazardous materials survey applies to every building, whatever its age

Owners tell us their house is too new to need one. The WorkSafeBC regulation has no age threshold at all, and it names the owner personally alongside the employers.

Mark Van Ek · October 17, 2026 · 9 min

Custom Homes

Passing your final inspection does not mean you can move in

These are two different things, in a specific order, and the Vancouver Building By-law is explicit about it. There is also a threshold where the requirement appears, and it lands exactly where a multiplex sits.

Mark Van Ek · October 15, 2026 · 8 min

Custom Homes

The building code does not require a heat pump. It requires a number.

Homeowners keep telling us the code makes them install a heat pump. It does not. It sets performance and emissions targets, and equipment choice follows from how you decide to hit them.

Mark Van Ek · October 14, 2026 · 9 min

Contracts & Costs

The Builders Lien Holdback, Explained for BC Homeowners

Most homeowners first hear the words builders lien when something has already gone wrong. The holdback is the part of BC law that protects you, and it only works if someone actually operates it.

Mark Van Ek · October 6, 2026 · 8 min

Contracts & Costs

Change Orders: How a Build Budget Actually Moves

Almost every project has change orders. The ones that hurt a budget are rarely the big obvious decisions. They are the small ones nobody wrote down at the time.

Mark Van Ek · October 5, 2026 · 8 min

Custom Homes

Building on a Sloped or Difficult Lot in Metro Vancouver

Steep lots produce the best views and the biggest budget surprises. Here is what slope, rock, groundwater, and access actually do to a custom home project, and how to find out before you buy.

Mark Van Ek · October 4, 2026 · 7 min

Custom Homes

Can you get home warranty insurance after a house is built in BC?

In B.C., a new home has to be enrolled in home warranty insurance before the building permit is issued. When a builder leaves partway through, or a house was never enrolled, the options depend on how far construction got and who finishes the work.

Mark Van Ek · October 1, 2026 · 9 min

Renovations

Underpinning: Adding a Basement Under an Existing Home

Underpinning lowers the floor beneath a house so a low basement becomes usable space. It is structural work, it is not cheap, and on the right house it creates a full extra floor without touching the exterior.

Mark Van Ek · September 30, 2026 · 7 min

Renovations

Should You Live in Your Home During a Renovation?

Staying put saves rent but can cost time and sanity. Here is how we help homeowners decide, including when phasing a project makes staying realistic and when it does not.

Mark Van Ek · September 26, 2026 · 6 min

Renovations

Whole-Home Renovation Timeline: What Each Phase Actually Takes

A full renovation has a rhythm, and knowing it makes the whole thing easier to live with. Here is what happens in each phase, how long it tends to take, and what your decisions are holding up.

Mark Van Ek · September 22, 2026 · 7 min

Custom Homes

Laneway Homes and Garden Suites: What Owners Should Know

A laneway home is a small, complete house in your backyard. For families housing a parent or an adult child, or owners adding rental income, it is often the most practical thing a lot can support.

Mark Van Ek · September 18, 2026 · 7 min

Custom Homes

How Long Does It Take to Build a Custom Home in Metro Vancouver?

From first conversation to keys, a custom home is a multi-year process for most families. Here is what each stage takes, which parts you control, and where schedules usually slip.

Mark Van Ek · September 14, 2026 · 7 min

Renovations

Adding a Second Storey or Building New: How to Decide

Going up gets you space without giving up yard, but it puts the entire existing house under review. Here is the framework we use with homeowners deciding between a second storey and starting fresh.

Mark Van Ek · September 10, 2026 · 7 min

Renovations

Heritage Home Restoration in Vancouver: What Owners Should Know

Restoring a character or heritage home means balancing what should be preserved against what needs to be replaced. Here is how owners in Vancouver approach that decision without losing the house or the budget.

Mark Van Ek · September 6, 2026 · 8 min

Renovations

Moving a House Instead of Demolishing It: How It Works in BC

Relocating a house sounds extreme until you compare it to demolition. Here is what makes a house moveable, what the permit path looks like in BC, and when relocation is genuinely the better option.

Mark Van Ek · September 2, 2026 · 6 min

Renovations

House Lifting in Vancouver: When Raising Your Home Makes Sense

Lifting a house is how many Vancouver owners get a full-height basement, a new foundation, and a legal suite out of a home they already like. Here is what the process involves and when it is worth doing.

Mark Van Ek · August 29, 2026 · 7 min

Renovations

Planning a Home Addition in Metro Vancouver: Cost, Permits, and Timeline

An addition can be the most efficient way to get the space your family needs without leaving the neighbourhood. Here is how the cost, the permit path, and the schedule usually work in Metro Vancouver.

Mark Van Ek · August 25, 2026 · 7 min

Renovations

Restoring a Heritage or Character Home in Vancouver: Process, Permits, and Cost Drivers

A heritage restoration runs on a different permit track and a different risk profile than an ordinary renovation. Here is what a Vancouver, New Westminster, or Burnaby heritage home actually involves, from the first status check to the final inspection.

Mark Van Ek · August 23, 2026 · 8 min

Renovations

What Does a Basement Renovation Cost in Metro Vancouver?

Finishing or reworking a basement is one of the most common renovations we get asked about. Here is what drives the budget in Metro Vancouver, from ceiling height and drainage to whether you are adding a legal suite.

Mark Van Ek · August 21, 2026 · 7 min

Custom Homes

Should You Buy Land First or Find the Builder First?

Learn how early builder input helps Vancouver homeowners assess lots, budget better, and avoid costly surprises.

Mark Van Ek · August 17, 2026 · 5 min

Renovations

High-Performance Homes in Vancouver: BC Energy Step Code

BC Energy Step Code affects custom home design, cost, and comfort. Here's what Metro Vancouver homeowners need to know before building.

Mark Van Ek · August 15, 2026 · 5 min

Renovations

Renovate the old house or take it down: how that decision actually gets made

The renovate versus demolish question rarely turns on one number. Here is the order a renovation contractor works through it, and the point where renovation stops making sense.

RealDream Contracting · August 14, 2026 · 5 min

Custom Homes

What is a Construction Manager, and Do You Actually Need One?

A construction manager coordinates planning, pricing, and trades while giving homeowners budget visibility. Here is how the role differs from a general contractor and when it is the right choice.

Mark Van Ek · August 11, 2026 · 6 min

News & Awards

Venture Pacific Named Georgie Awards Finalist in Three Categories for 2026

Georgie Awards finalist Vancouver: Venture Pacific earns three 2026 nominations for Kitsilano Horizon and Crescent Beach Revival.

Mark Van Ek · August 9, 2026 · 3 min

Contracts & Costs

How Much Does It Cost to Renovate in Vancouver in 2026

Renovation costs Vancouver homeowners face in 2026 depend on scope, finishes, and planning. See realistic ranges before you start.

Mark Van Ek · August 7, 2026 · 5 min

Contracts & Costs

Why Construction Costs in Vancouver Move Fast, and How to Stay Ahead of Them

Construction costs Vancouver homeowners face can change quickly. Learn what drives pricing and how to stay in control early.

Mark Van Ek · August 5, 2026 · 4 min

News & Awards

Venture Pacific Wins HAVAN Award 2026 for Best Kitchen Renovation

Kitchen renovation award Vancouver winner Crescent Beach Revival by Venture Pacific and Purity Design earned a 2026 HAVAN Award.

Mark Van Ek · August 3, 2026 · 3 min

Custom Homes

Luxury Home Builder Collaboration That Protects Design Integrity

Luxury home builder collaboration helps protect design integrity through early planning, clear roles, and better construction coordination.

Mark Van Ek · August 1, 2026 · 5 min

Renovations

What Homeowners Wish They Knew Before Renovating

Renovation planning Vancouver starts with clarity around scope, budget, hidden conditions, and builder involvement.

Mark Van Ek · July 30, 2026 · 4 min

Contracts & Costs

Custom Home Contract Types in Vancouver: Cost Plus, Fixed Price, or CCDC 5B?

Custom home contract Vancouver guide comparing Cost Plus, Fixed Price, and CCDC 5B for custom homes and major renovations.

Mark Van Ek · July 28, 2026 · 7 min

Contracts & Costs

What Soft Costs Should You Expect Before Building a Custom Home?

Soft costs, the design, engineering, survey, permit, and consultant work that happens before construction begins, can have a major impact on a custom home budget. Here is what to expect and how to plan for them from day one.

Mark Van Ek · July 24, 2026 · 7 min

News & Awards

Venture Pacific Receives Certified Renovation Company Designation from CHBA BC

Venture Pacific Construction Management has been accepted as a Certified Renovation Company through CHBA BC, reflecting our commitment to professionalism, accountability, and quality in residential renovation across Metro Vancouver and the Fraser Valley.

Mark Van Ek · July 22, 2026 · 3 min

Custom Homes

How to Hire a Custom Builder You Can Trust

Discover how to hire a custom builder you can trust. Learn how clarity, transparency, and steady communication give homeowners peace of mind.

Mark Van Ek · July 22, 2026 · 6 min

Renovations

Energy-Efficient Upgrades That Boost Resale Value

Boost resale value in Metro Vancouver with smart energy-efficient upgrades. Learn which improvements buyers want from expert home builders.

Mark Van Ek · July 20, 2026 · 5 min

Custom Homes

How We Make Projects Simple for Designers and Architects

Save time and know your project is on track with a team you trust. Managing residential, commercial and institutional construction projects.

Mark Van Ek · July 18, 2026 · 6 min

Renovations

Custom Home or Major Renovation: Which Is Right for You?

Deciding between a custom home or major renovation? Learn how to choose the right path based on your goals, budget, and lifestyle.

Mark Van Ek · July 16, 2026 · 6 min

Contracts & Costs

How Much Does It Cost to Build a Custom Home in Vancouver?

Per-square-foot averages are a reporting figure, not a pricing method. Here is what actually decides what a custom home costs in Vancouver, and where to look first.

Mark Van Ek · July 14, 2026 · 6 min

Contracts & Costs

The Truth About Cost-Plus Contracts

A recent video circulating on social media confidently claimed, “Cost-plus is always over.” If that’s been your experience, it likely means something critical was missing from the process. When managed properly, cost-plus contracts shouldn’t feel unpredictable or out of control.

Mark Van Ek · July 12, 2026 · 5 min

Custom Homes

The Importance of Selecting Your Builder Early

In a custom home build, timing is everything. One of the most critical decisions you will make is choosing your ‘Builder’ and the earlier you bring them on board, the better.

Mark Van Ek · July 10, 2026 · 3 min

Custom Homes

The Essential Role of an Interior Designer in Building a Custom Home

An interior designer custom home project needs early planning, clear selections, and strong coordination to keep design, budget, and construction aligned.

Mark Van Ek · July 8, 2026 · 5 min

Contracts & Costs

The Power of Certainty: Fixed Price Contracts in Residential Construction

A fixed price contract construction approach can offer cost certainty, clearer scope, and simpler financing for custom homes and major renovations.

Mark Van Ek · July 6, 2026 · 6 min

News & Awards

Venture Pacific Named 2023 Georgie Award Finalist for Kitsilano Home Renovation

A century-old Kitsilano home renovation by Venture Pacific and Phase One Design, named a 2023 Georgie Awards finalist in Vancouver.

Mark Van Ek · July 4, 2026 · 4 min

Contracts & Costs

The Building Permit Process in Vancouver, Step by Step

Building permit process Vancouver: required documents, pre-approvals, timelines, and key steps for new home construction explained.

Mark Van Ek · June 30, 2026 · 4 min

Renovations

Get the Best ROI With These 5 Home Efficiency Upgrades

Order matters more than the product list. Here are the five home efficiency upgrades that return the most in a Metro Vancouver climate, and the sequence that makes each one pay off.

Mark Van Ek · June 28, 2026 · 4 min

Common questions

About the Journal

What topics does the Venture Pacific Journal cover?

The Venture Pacific Journal covers Metro Vancouver and the Fraser Valley multiplex development, specifically BC's Bill 44 / SSMUH rules, GP/LP partnership structure for homeowners and investors, feasibility reviews, city-by-city permitting guides (Vancouver R1-1, Burnaby SSMUH, Richmond RSM), construction timelines, financing, and missing-middle housing strategy.

What is SSMUH and how does it affect Metro Vancouver and the Fraser Valley homeowners?

Small-Scale Multi-Unit Housing (SSMUH) is the BC provincial policy, enacted under Bill 44 in 2023, that requires municipalities to allow three to six homes on most standard residential lots without a rezoning. Lots within 400 metres of a frequent transit stop can add a sixth unit. This affects most Metro Vancouver and the Fraser Valley homeowners, including those in Vancouver, Burnaby, Richmond, Coquitlam, and New Westminster, by dramatically expanding what they can build on land they already own.

What is a GP/LP partnership in Metro Vancouver and the Fraser Valley multiplex development?

A GP/LP (General Partner / Limited Partner) partnership is a limited-partnership structure for real estate development. In a Venture Pacific arrangement, the homeowner contributes their land as equity and becomes a Limited Partner. Venture Pacific acts as General Partner, contributing capital, design, permitting, and construction management while carrying the construction risk. Proceeds are shared at project completion according to the partnership agreement.

How long does a Metro Vancouver and the Fraser Valley multiplex development take from lot to completion?

Most Metro Vancouver and the Fraser Valley SSMUH-compliant multiplex projects take 18 to 36 months from the start of the feasibility review to occupancy: six to twelve months for design and permitting, and twelve to eighteen months for construction. Projects requiring a rezoning or development variance permit take longer. Venture Pacific's Manchester Living project, for example, had its rezoning approved December 2023 and is expected to complete August 2026.

Does the Journal cover custom home building as well as multiplex development?

Yes. The Journal is organized into two sections: Build, covering custom homes, renovations, and construction contracts and costs, and Develop, covering multiplex development, SSMUH and Bill 44 zoning, GP/LP partnerships, and city-by-city permitting. Each post is tagged into one of these two sections so readers can filter to the topic that matches their project.

Can I get new Journal posts without checking the site?

Yes. The Journal publishes an RSS feed at venturepacific.ca/rss.xml that any feed reader can subscribe to. New posts on both the Build and Develop sides appear in the feed as soon as they go live, so a reader following BC housing policy or construction-cost updates does not need to check the page manually.

Are the Journal's zoning and permitting guides specific to one city?

No, they cover multiple Metro Vancouver and Fraser Valley municipalities separately, because SSMUH rules differ by city. Vancouver's guide explains the R1-1 zone, Burnaby's covers its R1 SSMUH district, and Richmond's covers the RSM zone. A homeowner should read the guide for their specific municipality rather than assume the rules match a neighbouring city.

Who writes the Venture Pacific Journal?

Journal posts are written by Venture Pacific's own team members and credited by name on each post. Most bylines link to that person's team profile page. This keeps the byline tied to a real, identifiable person rather than an anonymous company account, so a reader can check who is behind the zoning, financing, or construction guidance in any given article.

Let's talk about your property

A conversation, not a commitment.

Whether you're curious about the multiplex value of your land or looking to partner on a missing-middle build, we're here to start the conversation.