
We renovate kitchens in the Township of Langley and the City of Langley, from our office at Suite 351, 505-8840 210 Street in the Township. Our kitchen in the Crescent Beach renovation in Surrey won the 2026 HAVAN Award for Best Kitchen Renovation in the $150,000 to under $175,000 category. A kitchen puts plumbing, gas, wiring, a range hood, cabinets and sometimes a structural wall into one room. The permits you need depend on what moves, and on which of the two Langleys your house is in.
- 2026 HAVAN Awards
- Best Kitchen Renovation winner
- Kitchen exhaust fan, BC Building Code
- 47 L/s or more
- New or replaced gas range
- Technical Safety BC permit
- Garburator on a septic system
- Add septic capacity first
What a kitchen renovation with us can include
- A new layout, with the sink, range or fridge in a new place
- Opening or removing a wall for an open plan, with a beam sized for the load
- Custom cabinets, pantry storage and appliance cabinets
- An island with seating, drawers and built-in appliances
- Counters and backsplashes
- Plumbing for the sink, dishwasher and fridge water line, done by a licensed plumber
- Gas lines for a range or cooktop, done under a Technical Safety BC permit
- New circuits, outlets and lighting, done by a licensed electrician
- A range hood with its duct run to the outside
- New flooring
- A kitchen for a secondary suite
Recent work
Crescent Beach is a whole-home renovation we finished in Surrey, with a complete new kitchen. HAVAN named it the 2026 winner of Best Kitchen Renovation ($150,000 to under $175,000), and a finalist for Best Renovation ($400,000 to under $700,000).
See the Crescent Beach renovationIn short, Venture Pacific renovates kitchens in the Township of Langley and the City of Langley; its Crescent Beach kitchen in Surrey won the 2026 HAVAN Award for Best Kitchen Renovation ($150,000 to under $175,000). The City needs no building permit to replace cupboards but does for wall removal and new plumbing fixtures. Gas ranges and cooktops need a Technical Safety BC permit, the BC Building Code 2024 asks for a kitchen exhaust fan of 47 L/s or more ducted outdoors, and HealthLinkBC advises against a garburator on septic without added capacity.
What a kitchen renovation with us covers
Some kitchen jobs keep the layout and replace the cabinets, counters, floor and lights. Others change the plan: the sink moves to an island, a gas cooktop replaces an electric range, or the wall between the kitchen and the living room comes out. Both kinds use the same trades, in this order: demolition, framing, plumbing, gas, electrical and ventilation rough-in, inspections, drywall, flooring, cabinets, counters and lighting.
We plan the kitchen with you and your designer, apply for the permits, hire and schedule licensed trades, and book each inspection. Before any drawing, we check whether the house is in the Township or the City, when it was built, whether it is on sewer or septic, and which walls carry the floor or roof above.
If more of the house is changing, our page on home renovations in Langley covers whole-home work. We also take bathroom renovations in Langley, including single bathrooms.
Our award-winning kitchen: Crescent Beach, Surrey
The Homebuilders Association Vancouver (HAVAN) runs the HAVAN Awards for Housing Excellence, which reached their 17th year in 2026. At the gala on April 18, 2026, our Crescent Beach Revival project won Best Kitchen Renovation: $150,000 to under $175,000. HAVAN had also named it a finalist for Best Renovation: $400,000 to under $700,000. HAVAN's winners list names our firm as Venture Pacific Design + Build (Langley). The house is in Crescent Beach, Surrey.
HAVAN's article on the 2026 award-winning kitchens describes it: a long linear island that seats four or more people, with a built-in microwave, storage, and a pull-out garbage and recycling centre. A quartz waterfall edge and fluted base panels face the living room.
HAVAN groups kitchen entries by project value, and the dollar range is part of the category name. We price each Langley kitchen separately, from a site visit and a written scope of work.
- Best Kitchen Renovation: $150,000 to under $175,000
- Winner
- Best Renovation: $400,000 to under $700,000
- Finalist
- People seated at the island, in HAVAN's description
- 4+
- Year of the HAVAN Awards in 2026
- 17th
Source: Homebuilders Association Vancouver (HAVAN): And the award goes to (2026 winners); 2026 HAVAN Awards finalists announced (March 13, 2026); 6 award-winning kitchens setting the 2026 interior design trends



Township of Langley permits for a kitchen
The Township's renovation guide (January 2025) lists the work that needs a building permit. Two lines on that list apply to kitchens: to alter, repair or renovate an existing building, and to install new plumbing fixtures or re-arrange piping. A sink moved to an island, or a prep sink added, changes the piping. The Township's plumbing guide says no plumbing permit is needed to replace a fixture that stays in the same place, and that plumbing is usually included on the building permit when there is one.
When a wall changes, the guide asks for drawings that show every structural element: beams, lintels, floor joist size and direction, and all partitions and bearing walls. Where they apply, it also asks for plans sealed by a structural engineer, a Schedule B from a Professional Engineer, and beam schedules. Where the structure changes, we coordinate the engineer who seals the plans. The floor plans must also show the plumbing fixtures and appliances.
On a lot with a septic system, the application carries paperwork from a Registered Onsite Wastewater Practitioner (ROWP): a Fraser Health record of filing if the system is altered, or a Building Permit Referral Form if it needs no work. The Township sends gas and electrical permits to Technical Safety BC. It does not publish permit processing times.
City of Langley: what its guide says about kitchens
The City's guide for altering a single-family house (April 12, 2022) puts replacing cupboards on its list of non-structural, minor changes that need no building permit. Removing, moving, altering or building interior walls, and installing new plumbing fixtures, are on its permit list. So new cupboards in the same layout need no City building permit, and taking out a wall for an open plan needs one.
For permit work, the City's drawings must show all plumbing fixtures, appliances and the hot water tank, every partition and bearing wall, and the size of all beams and lintels. When a Professional Engineer is involved, the plans are sealed, and the engineer's field report must reach the Building Department before the frame inspection. That inspection comes once the framing, duct work, wiring and plumbing rough-ins are complete.
The City's title search must be no older than 48 hours. Its Engineering Department may review the utility connections when the house is over 30 years old or the work is worth more than $100,000, as our bathroom renovation page explains. The contact sheet in the same guide lists Technical Safety BC for gas and electrical permits, with a Langley office at 104-9525 201 Street.
Same layout
- What changes
- New cabinets, counters and floor; sink and range stay where they are
- City of Langley building permit
- Not needed to replace cupboards
- Township of Langley
- No plumbing permit for fixtures that stay in place; renovation is on the building permit list, so we confirm the scope first
- What the drawings show
- Fixtures and appliances, when a permit applies
- Gas and electrical (Technical Safety BC)
- Gas permit to replace a gas range or cooktop; electrical permit for new light fixtures
New layout
- What changes
- Sink moved to an island, range moved, gas run to a new cooktop
- City of Langley building permit
- Needed for new plumbing fixtures; we confirm a moved sink with the City
- Township of Langley
- Building permit to re-arrange piping, with plumbing usually included
- What the drawings show
- All plumbing fixtures, appliances and the hot water tank
- Gas and electrical (Technical Safety BC)
- Gas permit for new gas piping; electrical permit to move outlets or switches
Open plan
- What changes
- The wall between the kitchen and living room opened or removed
- City of Langley building permit
- Needed to remove or alter interior walls
- Township of Langley
- Building permit to alter the house
- What the drawings show
- Beams, lintels and bearing walls; sealed plans and a Schedule B when an engineer is involved
- Gas and electrical (Technical Safety BC)
- Electrical permit for switches and outlets moved out of the wall
Source: City of Langley, Addition or Alteration to a Single-Family Dwelling guide (April 12, 2022); Township of Langley, Residential Construction Guide: Additions, Alterations and Accessory Buildings and Plumbing Permit Application Guide (both January 2025); Technical Safety BC, Homeowner Gas Permits and Homeowner Electrical Permits
Gas ranges, cooktops and who may do the work
Technical Safety BC issues gas permits in both Langleys. It says a gas permit is needed to install or replace a gas range or cooktop, and to install or replace gas piping or vents. A homeowner can apply for a homeowner gas permit. Owners of a strata unit or a non-strata duplex, and people who run a business from home, cannot, and must hire a licensed contractor. When a licensed contractor does the work, the contractor applies for the permit. Under a homeowner gas permit, at least one inspection must be requested within 180 days of the date the permit was issued.
For the wiring, Technical Safety BC says a licensed contractor can replace existing switches, receptacles or thermostats without a permit, while new light fixtures and moved switches or outlets need one. We hire licensed contractors for the gas and electrical work in our kitchens, and each applies for its own permit.
Range hoods and kitchen ventilation
The BC Building Code 2024 sets the kitchen fan rule in Article 9.32.3.6: every kitchen gets an exhaust fan rated at 47 litres per second or more. Article 9.32.3.8 says exhaust ducts must discharge to the outdoors. When the fan grille is within 1.2 m sideways of a cooktop, as a range hood is, the duct must be noncombustible, resistant to corrosion and cleanable, with a grease filter where the air enters.
The code's duct table limits how far a duct of each size can run for each fan capacity, and it adds 10 m for the exterior hood (the cover where the duct leaves the house) and 3 m for each 90° elbow to a duct's real length. A long run to the roof needs a larger duct than a short run through the wall behind the range, so we plan the duct route at the same time as the cabinets and the ceiling.
These articles sit in the code subsection for a home's mechanical ventilation. The code also lets a house follow a CSA ventilation standard instead, so the designer confirms which path the house uses before the hood is chosen.
Kitchens in secondary suites, and a second kitchen in the house
The Township's Zoning Bylaw 2500 defines a dwelling unit as rooms for one family with only one set of cooking facilities. Its definition of cooking facilities is broad: ranges and stoves, microwave ovens, countertop cooking units, hot plates and wall ovens, the gas or electric lines that feed them, and kitchen cabinets and dishwashers. The zoning allows one secondary suite per house, the Township's suite guide limits it to 120 m² of finished living area, and every suite needs a building permit. Before we draw a second kitchen, for example a basement kitchen for family members, we check the plan against these definitions with the Township.
In the City of Langley, Zoning Bylaw 2025 No. 3300 defines a dwelling unit as a self-contained set of rooms with living, sleeping, cooking and sanitary facilities, and a secondary suite as a second dwelling unit inside the house. A City suite can be up to 100 m² or 40% of the building, whichever is less. It must be registered in the City's secondary suites registry, and the owner must live on the lot.
A suite kitchen also needs its own exhaust fan, because Article 9.32.3.6 of the BC Building Code covers every kitchen.
Kitchens on septic lots and in older houses
The Township's community plan says 75% of its area lies outside the urban area, and that rural areas are served by on-site sewer systems. The Brookswood-Fernridge plan says most of Brookswood-Fernridge is served by private on-site systems such as septic.
HealthLinkBC File 21 (March 2025), BC's health file on septic systems, tells owners not to install a garburator without increasing the capacity of the system. It also lists fats, grease and coffee grounds among the things that can plug the tank or the dispersal area. On a septic lot, we ask a ROWP to check the system before a food waste disposer goes into the sink plan. The Township needs the ROWP's paperwork with the permit application anyway.
For a house built before 1990, the Township's renovation guide says a hazardous material survey may be required, and kitchen demolition opens walls, ceilings and old flooring. Our home renovations page explains the WorkSafeBC rules.
What moves the cost of a kitchen renovation in Langley
We have found no credible, named source for Langley kitchen prices, so we print none. We price each kitchen from a site visit and a written scope of work. These are the things that change the number:
- The layout: keeping the sink, range and fridge where they are, or moving them
- Structure: removing a bearing wall, and the beam and posts that replace it
- Gas: a new gas line, or a change from an electric range to gas
- Ventilation: the hood, and the length and route of its duct to the outside
- Cabinets: custom or stock boxes, the number of drawers and pull-outs, appliance cabinets
- Counters and backsplash: the material and details such as a waterfall edge
- Appliances, including panel-ready and built-in units
- Electrical: new circuits, outlets and lighting
- Hazardous material testing and abatement in a house built before 1990
- A septic review on a lot without sewer
Questions about kitchen renovations in Langley
Do you do kitchen renovations in Langley?
Yes. We renovate kitchens in the Township of Langley and the City of Langley, on their own or as part of a larger renovation. Our office is at Suite 351, 505-8840 210 Street in the Township, and our Crescent Beach kitchen in Surrey won a 2026 HAVAN Award. Book a free consultation to start.
Do I need a permit to replace kitchen cabinets in Langley?
In the City of Langley, the alteration guide says replacing cupboards needs no building permit. In the Township, no plumbing permit is needed when the sink stays in the same place, but the renovation guide lists renovating as building permit work, so we confirm the scope with the Township first. A gas range swap needs a Technical Safety BC permit in both.
Can I remove a wall to open up my kitchen in Langley?
Yes, with a building permit from the Township or the City. The drawings must show the beams, lintels and bearing walls, and where an engineer is involved, the plans are sealed and a Schedule B is filed. In the City, the engineer's field report must reach the Building Department before the frame inspection. Our page on the custom home builder in Langley covers the Township's lot and zoning rules.
Who can install a gas range or cooktop in BC?
Technical Safety BC requires a gas permit to install or replace a gas range or cooktop. A homeowner can apply for a homeowner gas permit, except owners of a strata unit or a non-strata duplex and people who run a business from home, who must hire a licensed contractor. A licensed contractor applies for the permit on your behalf.
Does a kitchen range hood have to vent outside?
Under the BC Building Code 2024, every kitchen needs an exhaust fan rated at 47 L/s or more, and exhaust ducts must discharge to the outdoors. A duct whose grille is within 1.2 m of a cooktop must be noncombustible and cleanable, with a grease filter. The code also allows a house to follow a CSA ventilation standard, so the designer confirms which path applies.
Can I put a garburator in a Langley kitchen on a septic system?
HealthLinkBC File 21 says not to install a garburator without increasing the capacity of the septic system. We ask a Registered Onsite Wastewater Practitioner to check the system first, and the Township needs that person's paperwork with the permit application.
Can I add a second kitchen or a suite kitchen in Langley?
A suite kitchen, yes, with a permit. The Township allows one secondary suite per house, up to 120 m², and its zoning defines a dwelling unit as having only one set of cooking facilities, so we check any second kitchen with the Township before drawing it. In the City of Langley, a suite can be up to 100 m² or 40% of the building, must be registered with the City, and the owner must live on the lot.
What award did your kitchen win?
Our Crescent Beach Revival project in Surrey won Best Kitchen Renovation: $150,000 to under $175,000 at the 2026 HAVAN Awards, and was a finalist for Best Renovation: $400,000 to under $700,000. Our journal post on the HAVAN kitchen award tells the story.
How much does a kitchen renovation cost in Langley?
We have found no credible published price range for Langley kitchens, so we do not quote one. Moving the sink or range, removing a wall, gas work, the hood duct, cabinets, counters, appliances, hazardous material work and septic review all move the cost. We price each kitchen after a site visit.
What is the first step for a kitchen renovation in Langley?
A free consultation. We check whether the house is in the Township or the City, when it was built, whether it is on sewer or septic, and which walls carry load, then talk through the layout before you pay for drawings. Book a free consultation.
Related services
Nearby build areas
Sources
- Homebuilders Association Vancouver (HAVAN), And the award goes to (2026 HAVAN Awards winners)
- HAVAN, 2026 HAVAN Awards finalists announced (March 13, 2026)
- HAVAN, 6 award-winning kitchens setting the 2026 interior design trends
- Township of Langley, Residential Construction Guide: Additions, Alterations and Accessory Buildings (January 2025)
- Township of Langley, Plumbing Permit Application Guide (January 2025)
- Township of Langley, Other Building Permits
- Township of Langley Zoning Bylaw 2500, Section 100 (definitions)
- Township of Langley, Residential Construction Guide: Secondary Suites (January 2025)
- Township of Langley, Secondary Suites
- Township of Langley, Official Community Plan Bylaw No. 1842 (consolidated, with 2025 update)
- Township of Langley, Brookswood-Fernridge Community Plan Bylaw No. 5300
- City of Langley, Addition or Alteration to a Single-Family Dwelling: guide and application (April 12, 2022)
- City of Langley, Zoning Bylaw 2025 No. 3300
- Technical Safety BC, Homeowner Gas Permits
- Technical Safety BC, Homeowner Electrical Permits
- Province of BC, British Columbia Building Code 2024, Book I (Revision 2), Articles 9.32.3.1, 9.32.3.6 and 9.32.3.8
- HealthLinkBC File 21: Maintenance and operation of onsite sewage systems (March 2025)
Let's talk about your property
A conversation, not a commitment.
Whether you're curious about the multiplex value of your land or looking to partner on a missing-middle build, we're here to start the conversation.
