We are a general contractor for home renovations in Surrey. On a whole-home or major renovation you sign one contract with us. We coordinate the designer and engineer, apply for the City of Surrey permits, schedule the trades and book the inspections. This page covers the permits the City asks for, the permit times it publishes, and what to check before you hire any contractor.
- Our role
- General contractor, one contract
- City of Surrey renovation permit, October 26, 2026
- 2.4 weeks average, 6 week target
- Coach house or garden suite size
- 35 to 75 m²
- Builders lien holdback
- 10%
What a home renovation with us can include
- Whole-home renovations of the main floor, upper floor and basement
- Moving or removing walls, with engineered beams where the structure changes
- New kitchens and bathrooms
- Basement finishes
- New plumbing, wiring, heating and cooling, done by licensed trades
- New windows and exterior doors
- Home additions
- Renovations done in phases so you can keep living in the house
Recent work
Parisian Elements is a whole-home renovation we finished in Rosemary Heights, Surrey. It covered the main floor and the basement, took 6 months, and was done in two phases so the owners could keep living in the house. It was a 2022 HAVAN Awards finalist for Best Renovation.
See the Parisian Elements renovationIn short, Venture Pacific is a general contractor for home renovations in Surrey. The City of Surrey issues separate permits for interior renovations, basement finishing and additions, and on October 26, 2026 it reported 2.4 weeks for residential addition and renovation permits against a 6 week target. Coach houses and garden suites must be 35 m² to 75 m².
Which City of Surrey permit a renovation needs
The City of Surrey issues a different permit for each kind of renovation work on a single family or detached house. An interior renovation needs an Interior Renovation Permit. Finishing a basement needs its own Basement Finishing Permit. Building out or up needs an Addition Permit.
Every one of them starts with the Building Permit Application Form, a current title search and, when the applicant is not the owner, an Owner Authorization Form. Applications go in by email or in person at City Hall, 13450 104 Avenue. The City's interior renovation page says most interior renovations involve some structural work, and that a Registered Professional may need to provide signed and sealed drawings when a structural part changes. If a window or door is enlarged or added, the plans need an elevation of that wall and a cross-section through it.
The fee is a flat fee based on the proposed cost of the work. The City collects part of it during review and the balance before it issues the permit. Once the permit is issued, the approved drawing set must stay on site for the whole job.
Interior renovation
- Needed for
- Interior work in a single family or detached house
- Plans the City asks for
- One set of plans, with sealed structural drawings if structure changes
- Extra items
- Elevation and cross-section when a window or door is added or enlarged
Basement finishing
- Needed for
- Finishing the basement of a single family or detached house
- Plans the City asks for
- One set of plans, with sealed structural drawings if structure changes
- Extra items
- A guard or cover for any window well deeper than 600 mm (2 ft)
Addition
- Needed for
- Adding floor area to the house
- Plans the City asks for
- Site, foundation, crawlspace, floor, roof, elevation and cross-section plans
- Extra items
- Topographical survey no older than 6 months, rain screen details, and septic approval from Fraser Health where it applies
Source: City of Surrey, Interior Renovation Permit; Single Family Dwelling Basement Finishing Permit; Addition Permits (read October 31, 2026)
How long the City of Surrey takes to issue a renovation permit
On October 26, 2026, the City's permitting timelines page showed 2.4 weeks for residential addition and renovation building permits, against a City target of 6 weeks. The City calculates the current figure as an average of the permits it processed over the last 30 days. It applies to complete applications, so a missing document or drawing adds time that the figure does not show.
We check each package against the City's list before it goes in, and we ask the designer and engineer for anything that is missing first.
- Average City processing time for residential addition and renovation permits
- 2.4 weeks
- City target for the same permits
- 6 weeks
- Size of a coach house or garden suite
- 35 to 75 m²
- Parking space a coach house or garden suite needs
- 1 extra
Source: City of Surrey, Permitting Timelines (updated October 26, 2026); Coach Houses & Garden Suites
Adding a coach house or garden suite while you renovate
The City of Surrey allows coach houses and garden suites in the residential zones that allow detached houses, duplexes and houseplexes. A unit must be between 35 m² and 75 m². In the RA, R2, R2-O and R3 zones it can reach 120 m² when the existing house is below the maximum floor area ratio, the limit on floor area compared with lot size. A coach house must be attached to a garage, and garage space inside it counts toward that ratio.
On smaller R3, R4, R5, R5-S and R6 lots a coach house needs lane access. Without a lane, a garden suite may be possible instead. Each unit needs one parking space beyond what the house and any secondary suite already require. The City asks for an arborist report when the property has more than 5 trees, a pre-construction BC Step Code compliance checklist, and signed and sealed Schedule B forms from each Registered Professional. Our Langley coach house page shows how we plan these units in the Township and City of Langley.
Hiring a general contractor in Surrey: what you can check yourself
A general contractor who wants to build a new home in BC must hold a BC Housing builder licence. For a renovation of an existing house, these are checks any homeowner can make:
- A WorkSafeBC clearance letter. WorkSafeBC says a homeowner who hires a business that is not registered and paying premiums could be held responsible for those premiums.
- The permit. Ask to see it before work starts, and ask for the inspection results as each stage passes.
- The holdback. Under the BC Builders Lien Act, the owner keeps back 10% of the value of the work or of each payment. When the contract is worth $100,000 or more, the holdback goes into a separate holdback account, and the holdback period ends 55 days after completion. Our guide to [the builders lien holdback](/journal/builders-lien-holdback-bc-homeowners) explains how it works.
- Liability insurance. Ask for the certificate, and check its dates and the company it names.
What moves the cost of a Surrey home renovation
We have found no named, credible source for Surrey renovation prices, so we print none. Each job is priced from a site visit and a written scope of work. Where something behind a wall cannot be seen until it is opened, we set a documented contingency for it at the start. These change the price:
- How much of the house changes, and whether walls, beams or the foundation change
- Moving plumbing, and cutting a concrete slab for new drains
- Electrical upgrades and new heating or cooling
- Finishes, cabinetry and millwork
- Hazardous material testing and removal in an older house
- Permits and engineering
- Living in the house during the work, which can mean doing it in phases
Our work in Surrey
Parisian Elements, in the photos below, is a whole-home renovation we finished in Rosemary Heights, Surrey. It covered the main floor and the basement. We did it in two phases so the owners could keep living in the house. We take bathroom-only jobs in Surrey too.



Questions about home renovations in Surrey
Do I need a permit to renovate the inside of a house in Surrey?
Yes. The City of Surrey says you need a building permit for an interior renovation in a single family or detached house. You apply with the Building Permit Application Form, a current title search and one set of plans. The fee is a flat fee based on the cost of the work, with part paid during review and the rest before the permit is issued.
How long does the City of Surrey take to issue a renovation permit?
On October 26, 2026, the City of Surrey's timelines page showed 2.4 weeks for residential addition and renovation building permits, against a target of 6 weeks. The City calculates the figure from permits processed over the last 30 days, and it applies to complete applications only.
Do I need a permit to finish my basement in Surrey?
Yes. Surrey requires a Basement Finishing Permit for a single family or detached house. The plans must show any window well, with its materials, length, width and depth, and a window well deeper than 600 mm (2 ft) needs a guard or cover. Enlarging or adding a basement window also needs an elevation and a cross-section of the wall.
How big can a coach house be in Surrey?
A coach house or garden suite in Surrey must be between 35 m² and 75 m². In the RA, R2, R2-O and R3 zones it can reach 120 m² when the existing house is below the maximum floor area ratio. A coach house must be attached to a garage, and each unit needs one extra parking space.
Does a Surrey renovation need engineer's drawings?
It can. The City of Surrey says most interior renovations involve some structural work, and a Registered Professional may need to provide signed and sealed drawings when a structural part changes. We bring in the engineer at the planning stage, before the permit application, so the structural drawings match the design.
How do I check a general contractor in BC before I hire one?
Ask for a WorkSafeBC clearance letter, a copy of the building permit, a liability insurance certificate and the contract's holdback terms. Under the BC Builders Lien Act the owner keeps back 10% of the work's value, and on contracts of $100,000 or more it goes into a separate holdback account for 55 days after completion.
How much does a home renovation cost in Surrey?
We print no Surrey renovation prices because we found no named, credible source for them. We price each job from a site visit and a written scope of work. The biggest changes to the price are how much structure changes, moving plumbing, electrical and heating work, finishes, and whether you live in the house during the work.
What is the first step for a home renovation in Surrey?
Book a free consultation with Venture Pacific. We visit the house, confirm which permit the work needs, and give you a written scope of work. That visit comes before any drawings or permit application, so you know what the City will ask for and what the project involves.
Related services
Nearby build areas
Sources
- City of Surrey, Interior Renovation Permit (read October 31, 2026)
- City of Surrey, Single Family Dwelling Basement Finishing Permit (read October 31, 2026)
- City of Surrey, Addition Permits (read October 31, 2026)
- City of Surrey, Permitting Timelines (updated October 26, 2026)
- City of Surrey, Coach Houses & Garden Suites (read October 31, 2026)
- WorkSafeBC, Homeowners (insurance coverage and clearance letters)
- BC Housing, Builder and Developer Licensing
- Builders Lien Act, SBC 1997, c. 45 (sections 4, 5 and 8)
Municipal rules, fees and timelines change. Confirm them with the city or district before you buy, design or sign. This page gives general information. A planner, a lawyer or the municipality itself can advise on your lot.
Let's talk about your property
A conversation, not a commitment.
Whether you're curious about the multiplex value of your land or looking to partner on a missing-middle build, we're here to start the conversation.