Energy performance: what the Step Code asks your house to do

The BC Energy Step Code sets performance targets a new home has to meet rather than a list of parts it has to contain. Compliance is demonstrated with a whole-building energy model before the design is finalised and an airtightness test during construction, which means energy performance is a design decision rather than a finishing one. The required step depends on the building permit date and the municipality, because local governments can require higher steps than the provincial minimum through bylaw.

Part of Building or renovating a home in Metro Vancouver. Figures re-verified 2026-09-06.

Key takeaways

  • The Step Code is performance-based: it sets targets the building must hit rather than prescribing specific materials.
  • Requirements are grouped into steps, and the minimum step rises every few years toward net-zero energy ready new buildings by 2032.
  • The first step up occurred in May 2023, when most new buildings had to be 20 percent more energy efficient than the 2018 minimums.
  • Requirements depend on the building permit date and the project's location, so confirm them with the municipality.
  • Local governments may require higher steps than the provincial minimum through their own bylaws.
  • The Zero Carbon Step Code addresses operational emissions and was added to the code through amendments effective 1 May 2023.

Performance targets rather than a parts list

Older energy requirements worked prescriptively: install this much insulation, use windows of this rating, and the building was deemed to comply. The Step Code works differently. It sets performance targets for the building as a whole and leaves the design team to reach them.

That shift has a practical consequence homeowners feel. Because the target belongs to the whole building, decisions trade against one another. A design with a large glazed area can still comply, and reaching the target then requires more from the walls, the windows themselves, or the mechanical system. A more compact form with less glazing reaches the same target more easily.

This is why energy performance belongs in the early design conversation rather than at the end. Wall assemblies get thicker to hold more insulation, which affects interior dimensions. Window performance affects both cost and sightlines. Mechanical equipment needs space. Deciding these late means retrofitting them into a design that did not plan for them.

How compliance is actually demonstrated

Two pieces of evidence carry a project through Step Code compliance, and they occur at different times.

The first is a whole-building energy model, produced before the design is finalised. An energy advisor models the proposed building and confirms it meets the required step. Because the model has to precede final design, the energy advisor joins the consultant team during design rather than after it. A model run against a completed design that fails is a design revision.

The second is an airtightness test during construction, which measures how much air leaks through the completed envelope. This is the point where the Step Code stops being a paper exercise. Airtightness is achieved through detailing and workmanship at every junction: where walls meet floors, around every window and door, at every service penetration. It cannot be added at the end, and a building that fails the test requires investigation and remediation to find the leaks.

For a homeowner, the practical implication is that Step Code compliance depends on trades executing envelope details correctly on site. It is a construction quality requirement wearing the clothing of an energy regulation.

Which step applies to your project

This is where general advice fails and a specific answer is required. The Province states that BC Energy and Zero Carbon Step Code requirements are based on the building permit date of the project and where it is located, and that local governments have the authority to require higher steps through bylaw.

Both halves of that matter. The permit date governs which version of the requirements applies, so a project permitted this year and one permitted two years ago can sit under different targets. Location governs whether the municipality has gone beyond the provincial minimum, and across Metro Vancouver some have.

The direction of travel is settled even where the current number is local. Requirements are grouped into steps and the minimum step rises every few years, on a path the Province describes as leading to net-zero energy ready new buildings by 2032. The first step up occurred in May 2023, when most new buildings had to be 20 percent more energy efficient than the 2018 minimums.

Venture Pacific confirms the applicable step with the municipality for each project at the start of design rather than carrying an assumption from a previous build in another city.

The Zero Carbon Step Code, which is a separate question

The Energy Step Code and the Zero Carbon Step Code are two different instruments, and conflating them causes confusion during design.

The Energy Step Code addresses how much energy the building uses. The Zero Carbon Step Code addresses the emissions associated with operating it, and it was added to the building code through amendments effective 1 May 2023. The Province describes it as the path to zero carbon new buildings by 2030.

A building can perform well on energy and still carry operational emissions, depending on how it is heated. This is the decision point where space heating and domestic hot water equipment selection carries consequences beyond running cost, and it is another reason mechanical selection belongs early in design rather than late.

As with the Energy Step Code, which requirements apply depends on the permit date and the municipality, so it is confirmed per project.

Where the cost goes, and what comes back

Meeting a higher step directs money into specific parts of the building: the envelope, the windows, and the mechanical system. Those are not finish items and they are largely invisible in the completed house, which is why homeowners comparing budgets sometimes read them as overhead.

What comes back is measurable in use. A better envelope holds temperature, which lowers heating demand and reduces the equipment size needed to serve it. Airtightness combined with proper ventilation gives more consistent temperatures between rooms and better control of moisture, which matters in a coastal rain climate. It is also quieter, because the same detailing that stops air stops sound.

The building envelope also connects to warranty exposure. The five-year period of British Columbia's 2-5-10 home warranty covers building envelope defects including unintended water penetration that could cause damage, so envelope detailing carries consequences well past the energy model.

Venture Pacific does not publish a cost premium figure for a higher step, because it depends on the design, the site, and the step required. What is consistent is that designing for the target from the first sketch costs less than reaching it through changes made late.

Frequently asked questions

What is the BC Energy Step Code?

The BC Energy Step Code is a performance-based approach to energy efficiency in the British Columbia Building Code. Rather than prescribing specific materials, it sets performance targets the building as a whole must meet, grouped into steps. The Province states that the minimum step rises every few years along a path toward net-zero energy ready new buildings by 2032. Compliance is demonstrated through a whole-building energy model produced before final design and an airtightness test during construction.

Which Step Code level applies to my project?

The Step Code requirements that apply to a project are based on the building permit date and where the project is located, according to the Province of British Columbia. Local governments also have the authority to require higher steps than the provincial minimum through their own bylaws, and some Metro Vancouver municipalities have done so. Confirm the applicable step with the municipality having jurisdiction over the specific address at the start of design rather than assuming another city's requirement applies.

How is Step Code compliance proven?

Step Code compliance is proven with two pieces of evidence at different stages. An energy advisor produces a whole-building energy model before the design is finalised, confirming the proposed building meets the required step. During construction, an airtightness test measures air leakage through the completed building envelope. Because the model must precede final design, the energy advisor belongs on the consultant team during design rather than being engaged afterward.

What is an airtightness test and what happens if my house fails?

An airtightness test measures how much air leaks through a completed building envelope, and it is required to demonstrate Step Code compliance. Airtightness comes from detailing and workmanship at every junction: where walls meet floors, around windows and doors, and at every service penetration. A building that fails the test requires investigation to locate the leaks and remediation to seal them, which is why envelope detailing is treated as a construction quality requirement rather than a documentation exercise.

Is the Zero Carbon Step Code the same as the Energy Step Code?

The Zero Carbon Step Code and the Energy Step Code are separate instruments addressing different things. The Energy Step Code governs how much energy a building uses. The Zero Carbon Step Code governs emissions associated with operating the building and was added to the building code through amendments effective 1 May 2023, on a path the Province describes as reaching zero carbon new buildings by 2030. A building can perform well on energy while still carrying operational emissions, depending on how it is heated.

Does the Step Code apply to renovations?

Step Code requirements apply to new construction, and how they reach a renovation depends on the scope and on the municipality's application of the building code to that work. A renovation extensive enough to be treated as substantially reconstructed changes the position. Confirm with the building department having jurisdiction what applies to a specific renovation scope, because the answer differs by project rather than following a general rule.

How does energy performance affect the design of my house?

Because the Step Code sets a target for the whole building, design decisions trade against one another. A design with extensive glazing can comply, and reaching the target then demands more from the walls, the windows, or the mechanical system. Wall assemblies get thicker to hold insulation, which affects interior dimensions, and mechanical equipment needs space. Planning for the target from the first sketch produces a coherent house, while reaching it through late changes produces compromises.

Do I need an energy advisor for a custom home?

A custom home in British Columbia requires an energy advisor to produce the whole-building energy model that demonstrates Step Code compliance, and the Province notes the approach requires that model before the design is finalised. The advisor joins the consultant team during design alongside the architect or designer and the structural engineer. Engaging one only after drawings are complete risks a model that fails, which then requires design revision.

What are the practical benefits of building to a higher step?

Building to a higher step directs cost into the envelope, the windows, and the mechanical system, and the benefits appear in use rather than in appearance. A better envelope holds temperature, which lowers heating demand and can reduce the equipment size required. Airtightness with proper ventilation produces more consistent temperatures between rooms and better moisture control, which matters in a coastal rain climate. The same detailing that stops air movement also reduces sound transmission.

How does energy performance relate to my home warranty?

Building envelope quality connects Step Code performance to warranty exposure. The five-year period of British Columbia's mandatory 2-5-10 home warranty insurance covers building envelope defects, including unintended water penetration that could cause damage. The detailing that produces airtightness and the detailing that keeps water out are the same body of work executed at the same junctions, so envelope quality carries consequences long after the airtightness test is passed.

Go deeper in the Journal

Sources and references

Rate and regulation figures on this page were re-verified on 2026-09-06. Construction cost ranges come from Venture Pacific's own Metro Vancouver projects and are described as such wherever they appear.

  1. BC Energy and Zero Carbon Step Code requirementsProvince of British Columbia. Accessed 6 September 2026.
  2. BC Energy Step CodeProvince of British Columbia. Accessed 6 September 2026.
  3. BC Building Code 2024Province of British Columbia. In effect 8 March 2024. Accessed 6 September 2026.
  4. Home Warranty Insurance: what homeowners need to know (2-5-10 coverage)BC Housing, Licensing and Consumer Services. Accessed 6 September 2026.

Let's talk about your property

A conversation, not a commitment.

Whether you're curious about the multiplex value of your land or looking to partner on a missing-middle build, we're here to start the conversation.