Passive House and net zero homes in BC: the criteria, and how they compare with Step 5
Passive House and Net Zero are two voluntary standards for homes that use far less energy than the building code minimum. Passive House is set by the Passive House Institute in Germany: a certified home needs no more than 15 kWh of heat per square metre a year and must test at or below 0.6 air changes per hour at 50 pascals. The Canadian Home Builders' Association's Net Zero Home label recognizes homes that produce as much energy as they use in a year, and a Net Zero Ready label for homes built to the same efficiency without solar panels yet. The BC Building Code lets a Step 5 building use a Passive House energy model to show compliance. This chapter compares the three for homes in Vancouver and the rest of BC.
Part of Energy-efficient homes in BC: the Step Code, testing, and heating. Figures re-verified 2026-10-24.
Key takeaways
- The Passive House criteria allow heating demand of 15 kWh/(m²a), or a heating load of 10 W/m² as an alternative.
- A Passive House must test at or below 0.6 air changes per hour at 50 pascals; Step 5 allows 1.0.
- Passive House classes Classic, Plus and Premium allow renewable primary energy demand of 60, 45 and 30 kWh/(m²a).
- Sentence 9.36.6.3.(3) lets a Step 5 building use a Passive House Planning Package model, version 9 or newer, prepared by a certified designer.
- The CHBA Net Zero Home Labelling Program launched on 2 May 2017 after a pilot from September 2015 to December 2016.
- Net Zero Ready homes meet the same efficiency requirements as Net Zero Homes without renewable energy systems installed.
The Passive House criteria
The Passive House Institute names five principles behind its standard: good thermal insulation, energy-efficient windows, mechanical ventilation with heat recovery, no thermal bridges, and airtightness. Its Criteria for Buildings, version 10c dated 20 January 2023, turns these into numbers that apply in every climate.
Table 1 of the criteria sets a heating demand of no more than 15 kWh per square metre per year, or, as an alternative, a heating load of no more than 10 watts per square metre. Cooling and dehumidification demand is capped at 15 kWh per square metre per year plus an allowance that depends on climate. The pressure test result, n50, must be no more than 0.6 air changes per hour. The floor area used is the Treated Floor Area calculated in the Passive House Planning Package, the Institute's design software, shortened to PHPP.
The criteria also limit renewable primary energy demand, shortened to PER, which counts all energy used in the building. The limit is 60 kWh per square metre per year for the Classic class, 45 for Plus and 30 for Premium, and Plus and Premium also require on-site renewable generation of at least 60 and 120 kWh per square metre of building footprint. Comfort limits apply too: in a building without active cooling, the indoor temperature may exceed 25°C for no more than 10 percent of the hours in a year.
Certification requires a final check by a certifier. The Institute's page says the certifier reviews the energy balance calculation and asks for evidence from the build, including the airtightness test, the ventilation adjustment record and the site manager's declaration. A certificate is issued only if every criterion is met.
| Measure | Passive House Classic | BC Energy Step Code Step 5 (under 3,000 degree-days) |
|---|---|---|
| Heating | 15 kWh/(m²a) demand, or 10 W/m² load | 15 kWh/(m²·year) thermal energy demand intensity |
| Airtightness | n50 of 0.6 per hour or less | ACH50 of 1.0 or less (AL-4) |
| Whole-building energy | PER demand of 60 kWh/(m²a) or less | Mechanical energy use limit by floor area (Table 9.36.6.3.-H) |
| Floor area basis | Treated Floor Area (PHPP) | Floor area of conditioned space |
| Who checks | Certifier approved by the Passive House Institute | Energy advisor and the local building official |
How the BC Building Code treats a Passive House design
The BC Building Code names the Passive House standard directly. Sentence 9.36.6.3.(3) says buildings designed and built to Step 5 and to the Passive House Planning Package, version 9 or newer, are deemed to comply with the Step Code if the energy model was prepared by a Certified Passive House Designer or Certified Passive House Consultant approved by the Passive House Institute. That sentence lets the PHPP model replace the usual calculation and testing method in Sentence (2).
The heating numbers look alike: 15 for Passive House and 15 for Step 5 in places under 3,000 degree-days. They are measured on different floor areas with different software, so a home that meets one does not automatically meet the other. The airtightness limits differ: Passive House asks for 0.6 air changes per hour against 1.0 for Step 5, and the Institute measures against net air volume.
Passive House adds rules the Step Code does not have, such as the summer comfort limit and the renewable energy classes. The BC Building Code adds a rule Passive House does not have in the same form, the cooling requirement in Sentence 9.33.3.1.(2), which applies to every new home whatever standard it follows. Plan for both from the first drawing.
Net Zero and Net Zero Ready homes
The Canadian Home Builders' Association, shortened to CHBA, runs the Net Zero Home Labelling Program. Its page describes a two-tier technical requirement. A Net Zero Home produces as much clean energy as it uses each year, with on-site renewable energy systems. A Net Zero Ready Home meets the same efficiency requirements but does not yet have the renewable system, such as solar panels, installed.
The program launched on 2 May 2017 after a pilot that ran from September 2015 to December 2016. CHBA says a national network of its qualified service organizations and energy advisors works with builders and renovators to design, model, test and inspect each home, and that each home is verified by government-licensed third-party service organizations. CHBA's page reported 4,059 labels as of 9 October 2026; that is the association's own count. A renovation track, Net Zero Renovation, applies the same idea to existing homes.
The province uses similar words for its own goal. Its Step Code page says the minimum step rises every few years to move the industry toward net-zero energy ready buildings by 2032. The BC Building Code itself does not define net-zero energy ready, and no step in the tables is labelled with that term. Treat the 2032 date as the province's stated direction, and the CHBA label as a separate, voluntary standard with its own rules.
Natural Resources Canada's EnerGuide scale links these ideas. A rating of 0 gigajoules per year means a home produces as much energy as it uses. A Net Zero home aims for that point on the scale.
Frequently asked questions
What are the Passive House certification criteria?
Under the Passive House Institute's Criteria version 10c, a certified Passive House has a heating demand of no more than 15 kWh per square metre per year, or a heating load of no more than 10 W/m². It must test at or below 0.6 air changes per hour at 50 pascals and meet a renewable primary energy limit of 60, 45 or 30 kWh per square metre per year for the Classic, Plus or Premium class.
How airtight must a Passive House be?
The pressure test result, n50, must be 0.6 air changes per hour or less, under Table 1 of the Passive House Institute's criteria. For comparison, Step 5 of the BC Energy Step Code allows 1.0 and Step 3 allows 2.5. The Institute's EnerPHit retrofit standard allows 1.0.
Can a Passive House design be used to meet the BC Energy Step Code?
Yes, at Step 5. Sentence 9.36.6.3.(3) of the BC Building Code deems a building designed and built to Step 5 and to the Passive House Planning Package, version 9 or newer, to comply if a Certified Passive House Designer or Consultant approved by the Passive House Institute prepared the energy model.
Is a Passive House the same as a Step 5 home?
They overlap but differ. Both cap heating at 15 kWh per square metre per year in Metro Vancouver's climate, but they measure floor area differently. Passive House asks for tighter air sealing, 0.6 against 1.0 air changes per hour, and adds a summer comfort limit and renewable energy classes.
What is the difference between a Net Zero Home and a Net Zero Ready Home?
Under the CHBA Net Zero Home Labelling Program, a Net Zero Home produces as much clean energy as it uses each year with on-site renewable systems. A Net Zero Ready Home meets the same efficiency requirements but does not yet have the renewable system installed, so solar panels can be added later.
Who checks that a home qualifies for the CHBA Net Zero label?
CHBA says each Net Zero and Net Zero Ready home is verified by government-licensed third-party service organizations. Its qualified service organizations and energy advisors work with the builder to design, model, test and inspect each home. The builder or renovator must also be qualified in the program.
What do Classic, Plus and Premium mean for a Passive House?
They are classes based on renewable energy. Classic has no on-site generation requirement and a renewable primary energy limit of 60 kWh per square metre per year. Plus lowers that limit to 45 and requires generation of at least 60 kWh per square metre of footprint; Premium lowers it to 30 and requires 120.
Does a Passive House in BC still need cooling?
The BC cooling rule still applies. Sentence 9.33.3.1.(2) requires cooling that keeps one living space at or below 26°C unless a calculation shows it is unnecessary. The Passive House criteria separately limit hours above 25°C to 10 percent of the year in a building without active cooling, so the design work for both can be shared.
Is Step 5 the same as net-zero energy ready?
The BC Building Code does not use that term. The province's Step Code page says the rising minimum step moves the industry toward net-zero energy ready buildings by 2032, which is a stated goal. The CHBA Net Zero Ready label is a separate voluntary standard with its own requirements.
When did the CHBA Net Zero Home Labelling Program start?
CHBA launched it on 2 May 2017. A pilot ran from September 2015 to December 2016 to test the technical and administrative details. CHBA reported 4,059 labels as of 9 October 2026, by its own count.
Can a multiplex be built to the Passive House standard?
Yes. The Passive House Institute says its standards can be used in residential and most non-residential buildings, in every climate. In BC, a multiplex that meets Step 5 and is modelled in the Passive House Planning Package by a certified designer is deemed to meet the Step Code under Sentence 9.36.6.3.(3).
Go deeper in the Journal
Sources and references
Rate and regulation figures on this page were re-verified on 2026-10-24. Construction cost ranges come from Venture Pacific's own Metro Vancouver projects and are described as such wherever they appear.
- Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building, Version 10cPassive House Institute. Version 10c dated 20 January 2023. Accessed 24 October 2026.
- Building certification: Passive House and EnerPHitPassive House Institute. Accessed 24 October 2026.
- British Columbia Building Code 2024, Book I (General), Revision 2: Division B, Sections 9.32, 9.33, 9.36 and 9.37, and Appendix C, Table C-2Province of British Columbia. Code in effect 8 March 2024. Accessed 24 October 2026.
- BC Energy Step CodeProvince of British Columbia. Page last updated 9 June 2025. Accessed 24 October 2026.
- About the Net Zero Home Labelling ProgramCanadian Home Builders' Association. Page modified 9 October 2026. Accessed 24 October 2026.
- After your EnerGuide home evaluationNatural Resources Canada. Page modified 28 November 2025. Accessed 24 October 2026.
Let's talk about your property
A conversation, not a commitment.
Whether you're curious about the multiplex value of your land or looking to partner on a missing-middle build, we're here to start the conversation.