Township of Langley zoning bylaw, section 985

Zone CD-85: Comprehensive Development Zone CD-85

A zone for up to 507 homes as apartments, townhouses and small-scale multi-unit housing, placed on Lots 1 to 6 as Drawing A-021 in Section 985.11 shows, with buildings of 2.5 to 5 storeys.

7 lots and 1 strata properties carry this zone in the Township of Langley lot records.

How many homes

  • The bylaw sets the number of homes for the whole CD-85 site and gives no count for one lot: at most 507 homes, and density must also follow the area's Community or Neighbourhood Plan. Small-scale multi-unit housing is allowed only where Drawing A-021 places it, and the lot records do not say which part of the drawing a lot is in. (section 985.2 and 985.3)
  • Apartments (section 985.2 1))
  • Townhouses (section 985.2 1))
  • Small-scale multi-unit housing (3 or 4 homes on one lot) (section 985.2 1))
  • A secondary suite (a second home inside the house) (section 102)

The rules of zone CD-85

What the zone allows3 rules
  • Buildings and uses that serve a main use on the same lot (accessory buildings and uses). (section 985.1 1))
  • Home businesses, following Section 104.3. (section 985.1 2))
  • Homes: apartments, townhouses and small-scale multi-unit housing (small-scale multi-unit housing follows the R-CL zone in Section 403), with at most 507 homes on the lands rezoned by Bylaw 4961. Each use goes where Drawing A-021 in Section 985.11 places it. (section 985.1 3), 985.2 1) and 985.3)
Lot size for new lots2 rules
  • New lots made by subdivision must follow Section 110 of this bylaw and the Subdivision and Development Servicing Bylaw 2019 No. 5382. (section 985.8)
  • New lots must be at least: Lot 1 2,500 m² (26,910 sq ft); Lots 2 and 3 5,000 m² (53,820 sq ft); Lots 5a and 5b together 4,000 m² (43,056 sq ft); Lot 6 6,000 m² (64,583 sq ft). Lot 4 follows Section 403 (the R-CL zone), which asks for at least 220 m² (2,368 sq ft). (section 985.8 and 403.7)
How much of the lot buildings may cover1 rule
  • Buildings may cover at most 35% of Lot 1, 40% of Lot 2, 42% of Lot 3, 30% of Lots 5a and 5b, and 45% of Lot 6. Lot 4 follows Section 403 (the R-CL zone). (section 985.4)
Floor area and density1 rule
  • At most 507 homes on the lands rezoned by Bylaw 4961. Density must also follow the Community or Neighbourhood Plan. (section 985.2)
Height3 rules
  • Main buildings may be no higher than Drawing A-021 in Section 985.11 shows and the development permit sets. The drawing marks 5 storeys at most on Lots 1 and 2, 4 storeys at most on Lot 3 and on the larger buildings of Lot 6, and 3 storeys and 2.5 storeys at most on smaller parts of the site. (section 985.6 and 985.11)
  • Accessory buildings may be at most 3.75 m (12 ft 4 in) high or 1 storey, whichever is lower. (section 985.6)
  • Inside the Fort Langley area shown on the map in Section 104.5 3), buildings may be at most 9 m (29 ft 6 in) high and at most 2 storeys, with no room above the second storey. (section 104.5 2))
Distance from the property lines2 rules
  • The distances buildings must keep from property lines are set in the development permit, a permit from the Township that sets the design of the project. (section 985.5)
  • A heat pump or air conditioner may not be placed on a wall facing a side property line, or inside the required side distance, unless that side faces a side street or lane. It must be at least 1.5 m (4 ft 11 in) from every property line. (section 104.4 12))
Parking12 rules
  • Parking and loading spaces must follow Section 107 of the bylaw. (section 985.7)
  • Townhouses need 2 parking spaces for each main home, 1 space for each secondary suite, and 1 visitor space for every 5 homes. One space for each main home needs an electric car charging outlet. (section 107.3 a) ii) and note (1))
  • Where spaces are in tandem (one car parked behind another), the rate is 2.3 spaces per home, and at most 40% of the homes in a townhouse development may have tandem spaces. (section 107.3 a) ii))
  • Apartments need 1 parking space for each studio and 1.5 spaces for each home with one or more bedrooms, plus 0.5 spaces for each lock-off unit. Another 10% of the required apartment spaces must be for visitors. One space for each main home needs an electric car charging outlet. (section 107.3 a) iii) and note (1))
  • For parking, a studio is an apartment of at most 45 m² (484 sq ft) with no walls between the living, dining and kitchen areas and the sleeping area. (section 107.3 a) iii))
  • Parking for one-bedroom apartments may be cut by 15% when the lot is within 400 m (1,312 ft) of one of these corners: 86 Avenue and 202 Street (Carvolth Exchange), or 200 Street at 84, 80, 76, 72 or 64 Avenue. Visitor and accessible spaces are not cut. (section 107.1 4))
  • An apartment building with 50 to 199 homes needs 1 Class A loading space (at least 7 m (23 ft) long, 2.7 m (8 ft 10 in) wide and 3 m (9 ft 10 in) of clear height). With 200 to 299 homes it also needs 1 Class B space (at least 9.3 m (30 ft 6 in) long, 3.5 m (11 ft 6 in) wide and 4.3 m (14 ft 1 in) of clear height). (section 107.7 1) and 107.8 1))
  • In a residential comprehensive development zone, up to 20% of the required visitor spaces may be small car spaces, if each one is set at a right angle to the aisle, is at least 2.44 m (8 ft) by 4.88 m (16 ft), and has a sign saying it is for small cars only. (section 107.5 7))
  • Lots in the Willowbrook Transit-Oriented Area need no parking spaces for homes, except spaces for people with disabilities. Any spaces built there for homes must have electric car charging outlets. (section 107.1 3))
  • When the parking count comes out with a part of 0.5 or more, it is rounded up to the next whole space. (section 107.2 4))
  • Each home needs 1 parking space on the lot, and every lot needs at least 2 spaces. This rate covers houses, duplexes, mobile homes and small-scale multi-unit housing. (section 107.3 a) i))
  • On a corner lot with small-scale multi-unit housing of at least 3 homes, up to 2 more driveways may come in from the side property line, if that side street is a local street or lane and all driveways on the lot add up to no more than 12 m (39 ft 4 in) wide. (section 107.6 4))
Secondary suites4 rules
  • Each townhouse home may include one secondary suite, a second home inside the unit of at most 120 m² (1,292 sq ft). (section 102)
  • A home business may not be run inside a secondary suite. (section 104.3 a))
  • Each apartment may have one lock-off unit: a small home of at most 45 m² (484 sq ft) attached to the larger apartment through a connecting door or hallway. It may not be sold or stratified apart from the main apartment. (section 102)
  • A lock-off unit must be able to be locked off from the main apartment, have a living space at least 4 m (13 ft 1 in) wide and 4 m (13 ft 1 in) long, a sink, a stove or other cooking heat source, a fridge, and at least 3.7 m² (40 sq ft) of closet space. (section 104.20)
Other rules4 rules
  • Development must closely follow Drawing A-021 by Cotter Architects, dated May 10, 2010. (section 985.11)
  • Landscaping, screens and fences are set in the development permit. (section 985.9)
  • Council must issue a development permit (a permit that sets the design of the project) before a building permit is issued. (section 985.10)
  • In a residential comprehensive development zone, all home businesses on a lot may use at most 25 m² (269 sq ft) of floor space in total. Everyone who runs the home business must live in that home, and the business may only be an office run mainly by phone, computer or other communication equipment. (section 104.3 f) v), g) iv) and l))

Source: Township of Langley Zoning Bylaw No. 2500, Section 900 Comprehensive Development Zones. Section numbers are the bylaw's own. Bylaws change, so confirm the rules with the municipality before you buy or apply for a permit.

Built by Venture Pacific

Homes and buildings we have built

All projects

Questions about zone CD-85

What is zone CD-85 in the Township of Langley?

CD-85 is the Comprehensive Development Zone CD-85 in the Township of Langley zoning bylaw (section 985). A zone for up to 507 homes as apartments, townhouses and small-scale multi-unit housing, placed on Lots 1 to 6 as Drawing A-021 in Section 985.11 shows, with buildings of 2.5 to 5 storeys.

How many homes can I build in zone CD-85?

The bylaw sets the number of homes for the whole CD-85 site and gives no count for one lot: at most 507 homes, and density must also follow the area's Community or Neighbourhood Plan. Small-scale multi-unit housing is allowed only where Drawing A-021 places it, and the lot records do not say which part of the drawing a lot is in.

What can a lot be used for in zone CD-85?

The Township of Langley zoning bylaw allows these uses in zone CD-85: Buildings and uses that serve a main use on the same lot (accessory buildings and uses); Home businesses, following Section 104.3; Homes: apartments, townhouses and small-scale multi-unit housing (small-scale multi-unit housing follows the R-CL zone in Section 403), with at most 507 homes on the lands rezoned by Bylaw 4961. Each use goes where Drawing A-021 in Section 985.11 places it. Bylaw reference: 985.1 1).

How tall can I build in zone CD-85?

Main buildings may be no higher than Drawing A-021 in Section 985.11 shows and the development permit sets. The drawing marks 5 storeys at most on Lots 1 and 2, 4 storeys at most on Lot 3 and on the larger buildings of Lot 6, and 3 storeys and 2.5 storeys at most on smaller parts of the site. Accessory buildings may be at most 3.75 m (12 ft 4 in) high or 1 storey, whichever is lower.

How far from the property lines must a building sit in zone CD-85?

The distances buildings must keep from property lines are set in the development permit, a permit from the Township that sets the design of the project. A heat pump or air conditioner may not be placed on a wall facing a side property line, or inside the required side distance, unless that side faces a side street or lane. It must be at least 1.5 m (4 ft 11 in) from every property line. Bylaw reference: 985.5.

How much of the lot can buildings cover in zone CD-85?

Buildings may cover at most 35% of Lot 1, 40% of Lot 2, 42% of Lot 3, 30% of Lots 5a and 5b, and 45% of Lot 6. Lot 4 follows Section 403 (the R-CL zone). Bylaw reference: 985.4.

How big must a new lot be in zone CD-85?

New lots made by subdivision must follow Section 110 of this bylaw and the Subdivision and Development Servicing Bylaw 2019 No. 5382. New lots must be at least: Lot 1 2,500 m² (26,910 sq ft); Lots 2 and 3 5,000 m² (53,820 sq ft); Lots 5a and 5b together 4,000 m² (43,056 sq ft); Lot 6 6,000 m² (64,583 sq ft). Lot 4 follows Section 403 (the R-CL zone), which asks for at least 220 m² (2,368 sq ft). Bylaw reference: 985.8.

How much parking does zone CD-85 require?

Parking and loading spaces must follow Section 107 of the bylaw. Townhouses need 2 parking spaces for each main home, 1 space for each secondary suite, and 1 visitor space for every 5 homes. One space for each main home needs an electric car charging outlet. Bylaw reference: 985.7.

What floor area and storey limits apply in zone CD-85?

At most 507 homes on the lands rezoned by Bylaw 4961. Density must also follow the Community or Neighbourhood Plan. Bylaw reference: 985.2.

Are secondary suites allowed in zone CD-85?

Each townhouse home may include one secondary suite, a second home inside the unit of at most 120 m² (1,292 sq ft). A home business may not be run inside a secondary suite.

Which bylaw sets the rules for zone CD-85?

The rules for zone CD-85 come from Township of Langley Zoning Bylaw No. 2500, Section 900 Comprehensive Development Zones. The zone's own bylaw section is 985. Every figure on this page names the bylaw section it comes from, and the bylaw itself is the legal text if a number here differs from it.

How many lots are zoned CD-85?

The Township of Langley lot records list 7 lots and 1 strata properties in zone CD-85, on 3 streets.

Streets with lots in zone CD-85

Contains information licensed under the Township of Langley's Open Government License.