Building permits in Metro Vancouver

The permits a Metro Vancouver project needs, what has to be in place before applying, what a complete application contains, how review works, how long it takes, and the sequence from first inspection to occupancy.

39 pages, 7 parts, 8 sources. Written by Mark Van Ek. Figures re-verified 2026-09-23.

Free guide

Building permits in Metro Vancouver

PDF, 39 pages

Free PDF

Would you like this guide as a PDF?

All 7 parts in one 39-page file to keep or print. Leave your name and email and you can download it right away.

What is inside

  1. Overview

    Building permits in Metro Vancouver.

  2. Part 1

    Which permits your project needs, and who issues each one

    Building, development, demolition, and trade permits, and who issues each.

  3. Part 2

    What has to be in place before you can apply

    Builder licensing, warranty registration, and owner builder rules.

  4. Part 3

    What a complete application contains, and why completeness decides your schedule

    Drawings, schedules, reports, and the completeness rule.

  5. Part 4

    What happens during review, and how to answer a reviewer quickly

    Referrals, reviewer comments, and the correspondence cycle.

  6. Part 5

    How long permits take across Metro Vancouver

    Published processing times, and what they actually measure.

  7. Part 6

    From first inspection to occupancy

    The inspection sequence, trade inspections, and occupancy.

Key points from the guide

  • A building permit covers the structure. Electrical and gas work is permitted separately by Technical Safety BC.
  • A New Home Registration Form, proving builder licensing and warranty, is needed before a new home permit is issued.
  • An Owner Builder Authorization is required before construction anywhere in BC, even where no building permit is needed.
  • Richmond does not accept incomplete applications, and Surrey rejects applications missing required documents.
  • Surrey reported residential building permits at 5 weeks against a 10 week target, published 21 September 2026.
  • Surrey's processing clock starts after referrals and servicing review, not at submission.
  • Burnaby requires a development permit before a building permit for some projects, effective 1 July 2026.
  • Occupancy is a separate step from the final inspection, and it starts the warranty coverage periods.