Port Moody sits on the north shore of Burrard Inlet with two SkyTrain stations, a compact housing stock dominated by single-family lots, and relatively little developer competition for city-specific projects. Bill 44 changed what those lots can hold. As of June 2024, most RS-zoned properties in Port Moody can now support three or four homes, and lots within 400 metres of a frequent transit stop can support six. Venture Pacific partners with Port Moody homeowners to develop that potential into a finished, well-built multiplex.
- Zone
- RS (SSMUH-enabled)
- Units
- 3 to 4 per lot
- Near frequent transit
- Up to 6 per lot
- In effect since
- June 2024
In short, Port Moody adopted Bill 44 SSMUH amendments in June 2024, allowing 3 to 4 units on most RS-zoned lots and up to 6 units on lots within 400 m of frequent transit. The city has two SkyTrain stations (Moody Centre and Inlet Centre) with designated Transit Oriented Areas exempt from SSMUH. Port Moody's DCC Reduction Bylaw offers a 25% per-unit fee cut for rental-tenure multiplex projects. Venture Pacific partners with Port Moody homeowners to develop multiplexes under the current rules.
What changed in Port Moody
In June 2024, Port Moody Council approved Zoning Bylaw Amendment No. 94, 2024 (Bylaw No. 3460), folding provincial Bill 44's small-scale multi-unit housing requirements into the city's RS residential zones. No rezoning is required for eligible properties, the new rules apply as of right.
The framework follows the provincial baseline: lots under 280 m² allow up to three units; lots between 280 m² and 4,050 m² allow up to four; and lots of 280 m² or more within 400 metres of a prescribed frequent transit stop allow up to six, with minimum parking requirements eliminated. Permitted forms include multiplexes, duplexes, laneway homes, and accessory dwelling units, subject to a three-storey maximum height.
Port Moody adopted a Guide to SSMUH on July 22, 2025, to help property owners and builders understand the process. The City has also targeted updates to its Development Approval Procedures Bylaw and Fees Bylaw by February 2026. One standing provision worth knowing: Port Moody's DCC Reduction Bylaw offers a 25% per-unit reduction on development cost charges for rental-tenure multiplex projects, among the more generous standing DCC reductions in the region for build-to-rent multiplex work.
What this means for a Port Moody homeowner
Port Moody's housing stock is older single-family, most of the city's residential fabric was built out decades ago on lots that were sized for one house. The Bill 44 changes do not alter the land; they alter what the land can legally hold. A lot that once supported one home can now support three or four, and the right lot near one of the city's two SkyTrain stations can support six.
That said, a multiplex is still a real construction project. Design to Port Moody's interim multi-family guidelines, permit management, financing, trades, and a careful read of the site's Development Permit Area conditions (DPA 4 and 5 apply for environmental and hazard protections), all of that has to be managed. We carry that work and the construction risk through a written GP/LP partnership, while the homeowner contributes the land.
- Feasibility review against Port Moody's current SSMUH rules and DPA requirements
- Highest-and-best-use analysis by lot size, transit proximity, and site constraints
- Multiplex design to the city's interim multi-family guidelines
- Permit and building-approval management with the City of Port Moody
- Construction and quality control to completion under the BC 2-5-10 home warranty
Transit proximity and where the opportunity concentrates
Port Moody has two Evergreen Line SkyTrain stations: Moody Centre and Inlet Centre. Both are designated Transit Oriented Areas (TOAs) under provincial legislation, with their own density minimums and height requirements, TOA lands are exempt from SSMUH and governed by separate provincial rules that allow much higher density. But the SSMUH opportunity sits on the RS lots that surround those TOAs, particularly the properties within 400 metres of a frequent transit stop that qualify for up to six units.
Moody Centre is a multi-modal hub integrating SkyTrain with the West Coast Express and a major bus exchange, it generates strong residential demand from commuters. The Inlet Centre area, near Newport Village, is an established walkable neighbourhood with retail, dining, and active transit-oriented development already underway. Lots in both areas draw attention from investors and developers, but Port Moody's market remains smaller and less picked-over than Coquitlam or Surrey. City-specific queries here have less competition.
Interior neighbourhoods like Glenayre, College Park, and Heritage Mountain sit further from the stations but offer larger, quieter RS lots, often well-suited to three- or four-unit projects where each home gets its own entry and outdoor space. The hillside topography in parts of Port Moody is a real site condition to account for: slope and drainage affect both buildable area and foundation cost, which is part of what a proper feasibility review covers.
Port Moody's approval path today
SSMUH projects in Port Moody that comply with the RS zone standards and do not fall within a Development Permit Area can move directly to building permit. Properties within DPA 4 (environmental) or DPA 5 (hazardous lands), which include areas near watercourses, steep slopes, and sensitive terrain, still require a Development Permit before a building permit can be issued. Port Moody has more DPA-affected lots than many cities in Metro Vancouver, given its geography, so confirming whether a specific property is in a DPA is part of the feasibility step.
The City's February 2026 target for updating its Development Approval Procedures Bylaw and Fees Bylaw means the process is still evolving. We track those changes so a project scoped today is built against the current rules, not an outdated assumption.
Questions about Port Moody
How many units can I build on my Port Moody lot?
Under Port Moody's SSMUH rules, lots under 280 m² allow up to three units. Lots between 280 m² and 4,050 m² allow up to four. Lots of 280 m² or more within 400 metres of a frequent transit stop can support up to six units, with no minimum parking required. A feasibility review confirms the number for your specific property, including any Development Permit Area conditions that apply.
Do I need a rezoning to build a multiplex in Port Moody?
No. Bill 44's SSMUH permissions are built into Port Moody's RS zones as of June 2024, so eligible properties can proceed through the building permit process without a full rezoning. Exceptions apply for lots inside a Development Permit Area, which still require a Development Permit before a building permit.
What are Port Moody's Transit Oriented Areas, and how do they affect my lot?
Port Moody has two SkyTrain stations, Moody Centre and Inlet Centre, each with a designated Transit Oriented Area (TOA). TOA lands are excluded from SSMUH and governed by separate provincial density rules that allow significantly higher buildings. SSMUH applies to the RS lots surrounding TOAs. If your lot is inside a TOA boundary, the rules are different, we confirm which framework governs your property during feasibility.
Does Port Moody offer any fee reductions for multiplex projects?
Port Moody's DCC Reduction Bylaw offers a 25% per-unit reduction in development cost charges for rental-tenure multiplex projects, one of the more generous standing DCC reductions in Metro Vancouver for build-to-rent work. The non-profit version goes further. The City is also updating its Fees Bylaw with a February 2026 target, so the full cost picture is best confirmed during a current feasibility review.
Are there site constraints I should know about in Port Moody?
Yes. Port Moody's geography includes watercourses, steep slopes, and sensitive terrain that place a meaningful number of residential lots inside Development Permit Areas (DPA 4 and DPA 5). A lot inside a DPA still needs a Development Permit before a building permit, which adds time and some cost to the approval path. Confirming DPA status is part of our feasibility review for every Port Moody property.
What is the first step for a Port Moody homeowner?
A free consultation and feasibility review of your property. We confirm your lot's SSMUH allowances, its transit proximity, any DPA conditions, and give you an honest read on what's possible under the current rules, before you commit to anything.
Related guides
- How Bill 44 and SSMUH changed what you can build across Metro Vancouver
- How living near frequent transit unlocks more units on your lot
- How construction financing and CMHC MLI Select work for a multiplex
- How a GP/LP development partnership works for Port Moody landowners
- From single-family to fourplex: the approval and construction timeline